One Test, Three Submittals: The New Electronic Reporting Rules for Combustion Turbines

One Test, Three Submittals: The New Electronic Reporting Rules for Combustion Turbines

Category: Webinar
Date: August 26th, 2026
Time: 12:00 PM - 01:00 PM Eastern Time

What’s the Webinar About?

On January 9, 2026, U.S. EPA finalized a New Source Performance Standard (NSPS) for combustion turbines, creating 40 CFR Part 60, Subpart KKKKa and revising the existing Subparts GG and KKKK. NSPS KKKKa and the revisions to NSPS GG and KKKK now require performance tests, Relative Accuracy Test Audits (RATAs), and periodic compliance reports to be submitted electronically to EPA through the Compliance and Emissions Data Reporting Interface (CEDRI), using the Electronic Reporting Tool (ERT).

It is very important to distinguish that the ERT is NOT just a means to upload an emissions testing report. The ERT requires run-by-run data entry that makes this data highly transparent and readily available for electronic evaluations and analysis. Reporting errors, inconsistencies, or incomplete submissions can result in improper conclusions by regulatory agencies and potentially influence future rulemaking.

In this session, we will break down what actually changed, what must  be submitted and when, and why the same test may now require reporting through three separate systems. We will also share how ALL4 develops and reviews ERT submittals, drawing on decades of emissions testing and ERT experience to produce files that are accurate, on time, and faithful to the underlying test data.

Who Should Attend?

This webinar is ideal for environmental and air compliance managers, plant and environmental engineers, and anyone responsible for turbine performance testing, continuous emissions monitoring systems (CEMS) performance evaluations, or NSPS reporting. Whether your facility operates a single turbine or a large fleet, and whether you are already reporting through CEDRI or just getting started, you will leave with a clear picture of what the new rules require and what to do next.

Attendance is limited to industry participants and regulators and is not open to consultants.

Why Attend?

Get a plain, practical read on the new combustion turbine electronic reporting requirements and learn exactly what has to go to EPA electronically, how the deadlines work, and where ERT preparation most often goes wrong. Then see how ALL4 handles the entire ERT and CEDRI process for you, accurately and on schedule, so your team can certify with confidence and stop losing time to reporting. Led by consultants who prepare and validate these submittals every day, this session will show you why partnering with ALL4 is the clear choice for staying ahead of the deadlines.

Presenters:

Matt Carideo, Technical Team Leader, CMS // mcarideo@all4inc.com // 610.422.1139

Eric Swisher, Technical Director // eswisher@all4inc.com // 610.422.1117

Aditya Shivkumar, Technical Manager // ashivkumar@all4inc.com // 281.201.1239

Continuing Education:

ALL attendees will receive a certificate of attendance.

 

Please complete the form below. If the registration form does not display or if you are unable to submit the form, please make sure your ad blocker is turned off or open this page in a private browser.

If you need assistance with your webinar registration contact webinars@all4inc.com

    4 THE RECORD EMAIL SUBSCRIPTIONS

    Sign up to receive 4 THE RECORD articles here. You'll get timely articles on current environmental, health, and safety regulatory topics as well as updates on webinars and training events.
    First Name: *
    Last Name: *
    Location: *
    Email: *
    Skip to content